Saturday, January 3, 2015

No Mahti was not ... Now we are trying to correct this mistake, and afterwards a few pieces of info


No Mahti was not ... Now we are trying to correct this mistake, and afterwards a few pieces of information written in an interim developments, as well as add pictures. Backyard, a white ground until 01.11.2014 Midsummer Day 2013 was the first night in the house, and spent it on the move as well as quietly began hitting. akari If a large part of July and August had two more between home life, the days of the end of August, the city became a smash blank is moved out of the apartment as a tenant wanted, and now we are ready to move it slowly settled in. Terrace Economic hot tub, and a stack of wood-frame planting boxes are all ready, Sebastian was assembled playhouse, although later required to move to the correct location, yet warm and heating akari systems akari could work - the long-awaited Radikad got everything in place, and the place is at some point. Radikal became smarter management of acquired akari Fibaro home automation system, and radikatele Danfoss Z-Wave thermostats. Some ukseliiste also been cut to size and place :). In September, was ordered to sand, soil and freesasfalti and the area around the house is now mostly complete. Fencing akari the area, ie. The edges of the plot is still partly songermaa, but the rest is planted with grass and autumn akari too long, thanks to the warm and beautifully sprung. Garage side was stacked limestone with higher levels planted, which is fulfilled for the home is now planted in the soil for seven currant bushes, stacked limestone campfire with a piece of a stone fence paejärsaku akari edge was also prepared. All plots felled trees, akari a total of ca. 8 room size was cut, broken and stacked. In autumn, the number of plants and met with them shopatud istutuskastid terraces. In October, however, went far been unmoved, and slurried in order to further the stone walls of the warehouse, etc. is now waiting for spring. Flagstone had pre-ordered, but they still need to be sure to order the spring. Furnishing akari the field had visited akari the store and ordered off the bed stairs. Both are present and in place. Also try to lure back a few last piece of the past to carry out the work done inside the house painters, but without success - she had received a filling knife and the roller itself. So the wall was finished with another couple, which originally had been primed, because akari she could not at that point yet hue finally put in place, and a sauna shower room ceiling. Some curtains were well ordered and place. Sauna World and was built by the men went to the steam room, and plug the heater into place. Now you have 3 bath house :), keg, aurukas and sauna, and all of them are already well-established. In addition to the space heater was installed in the spring of ara bought ventilation unit and the whole place ventsüsteem tuned õhukogustele designed akari accordingly. 21:10 Sabina was born in the fresh air does not have to worry about :). Pisitimmimisi, such as the installation akari of some lamps, both inside as well as outside, etc. Forward-wardrobe lockers, the introduction of the second-floor (bathrooms need to fine-tune), I floor toilet cabinet economies in the spring, and then be sure to include landscaping akari and fencing, and perhaps even an outdoor kitchen fronts. Next year's plans could fit in air-to-water heat pump installation cost due to the reduction of today's fired.
2013-08-26 - On 2012-10-01 moved out - Fitting 2012-03-19 - 2011-07-24 White Box - indoors further pressure 2011-03-29 - New Direction, half the purchase of a house 2010-07-02 - A building akari in the 2010-04-22 - 2010-02-17 Building permits are filed - Preliminary design of architects to 2009-07-26 - 2009-06-15 demolished cottage apple 28 - Plots Joined 2008-12-20 - 30 apple cottage demolished in 2008-12 -05 - The first drawings from the architects 2008-11-17 - 2008-10-17 The design of the beginning - there are two plot 2008-08-04 - Lot 1 available
landscape design (4) alternative energy (1) Blogging (2) Documents (21) Construction (10) Construction Material (2) Electricity (13) Euribor (3) facade (8) Landscaping (27) Weather (1) sanitation (7) umbrella ( 11) Moving (1) plastering (4) plot (36) Heating (34) Ceilings (8) loans (6) Demolition (17) from which to build? (4) Passive House (2) Photos (1) soil (10) Tiling (3) Planning (13) The problem with the constructor (6) design (21) Solar heating (2) Walls (7) Interior Design (9) decoration (24) Fitting ( 5) The step (3), ventilation (8) Water (10), the foundation akari (4)
2015 (1) January (1) 2014 (1) January (1) HUA, 2014! 2013 (2) July (1) January (1) 2012 (12) November (1) October (1) August (2) July (2) July (1) May (1) March (1) February (1) January (2) 2011 (27) December (1) November (2) October (3) September (2) August (4) July (5) June (3) May (4) April (1) March (1) February (1) 2010 (11) December (1) November (2) September (1) July (2) May (the

No comments:

Post a Comment